Services
Ongoing Projects
Roads From Highway To The Plant Knauf
SERBIA
DEVELOPER |
: City Directorate for Roads |
PROJECT NAME |
: Infrastructure |
PERIOD |
: 3.5 Months |
BUILDING AREA |
: 15.6 km |
Types of Work: Complete roads with sidewalks, parking lots, infrastructure, water supply, rain and fecal sewage, park decoration, pipeline, Outdoor lighting, external installation of telephone and tele-communications installations, traffic signals and greening of.
Length of Constructed Road: 4 .2 km.
The Total Length of the Built Infrastructure: 15.6 km.
Taca © 2016. All Rights Reserved.